In Case You've Wondered

My blog is where my wandering thoughts are interspersed with stuff I made up. So, if while reading you find yourself confused about the context, don't feel alone. I get confused, too.

If you're here for the stories, I started another blog: scratchingforchange.blogspot.com

One other thing: sometimes I write words you refuse to use in front of children, or polite company, unless you have a flat tire, or hit your thumb with a hammer.

I don't use them to offend; I use them to embellish.

jescordwaineratgmail.com

Wednesday, March 19, 2014

Wandering Thoughts

I saw something on the way to the motel I never saw before: A crime scene, with yellow tape wrapped around the scene.

I have no idea what happened, but there was one of Galveston's S.U.V. police vehicles blocking the drive of strip shopping center, tape wrapped to keep pedestrians away, a group of employees sitting on the sidewalk in front of the building and a few officers milling around.

I was only passing, so I didn't have time to look, or find out anything, so it's an enigma.

Another thing I was thinking of is how - if I had lots of money - it would be neat to have Herve Villechaize and Ricardo Montalban on video when they find the missing 777. Ricardo could look distinguished and Herve could point and say "The plane!! The plane!!!!!!.

Unfortunately, neither is still around and I don't have that kind of money.

Drats.

Sunday, March 16, 2014

Numbers in My Head

I had to bring my paperwork to the office this morning. As I drove, I thought of the numbers that roll around in my head. They're there for immediate reference and I doubt I'll forget any in the future, unless I become severely demented.

110 - The pounds of one inch of asphalt base per square yard of coverage

9 - Square feet in one square yard.

2000 - Pounds in one ton.

27- Cubic feet in a cubic yard

150 - Pounds per square foot of each foot of concrete in a form. If you run the numbers, tall pours require substantial bracing at the bottom of a form. Wall ties I approximate at 2000 pounds of tensile strength each.

1/8 - The rise in bar diameter in inches for each designation. For example No. 3 bar is 3/8 inches. No 4 is 1/2 inches, No. 5 is 5/8....etc.

3.142 - An acceptable approximation of pi for calculations involving circles.

.7854 - pi divided by four. I use it to multiply with the diameter squared of a circle to determine the area. (I find it easier to to use.)

.2156 - The area of a fillet. I use it to determine the square footage of a fillet in the turnout radius of a drive.

3.28084 - feet in one meter

25.4 - millimeters in one inch

39.375 - inches in one meter

7.62 - meters in one standard section of guardrail, which slightly longer than 25 feet to allow for lapping.

6.25 - distance between the centers of standard guardrail posts.

21 - inches above the ground for the center line of a guardrail bolt.

3,4,5 - Proportion of a right triangle. When all you have are two measuring tapes, some string and some stakes, any multiple of the three dimensions can be used as a poor boy way of squaring anything.

490 - weight of a square foot of steel. I've used this to determine the unknown weight of structures for demolition. Measure the members, figure the total cubic feet and you arrive at a usable approximation of weight.

231 - cubic inches in a gallon. This required when figuring the amount of sealant for sealing paving cracks, or caulking.

The list goes on. I use the decimal value of inches constantly, since surveying requires conversion of inches to feet.

In school, I was deplorable in math. I'm guessing my mind doesn't work well with abstract numbers, but can make do with practical applications.





Saturday, March 15, 2014

Back In The Days

I'm not an ironworker, although I've hung iron before.

When I was younger, I could participate with projects involving the erection of steel. Most were for pre-engineered metal buildings, but some were standard structural members.

Most people don't pay attention to the erection of steel, but it's an involved process, with many pitfalls. From conception, to finish, many are involved and the final result is the frame for a building, or support for an object, or machinery.

Engineers determine the correct size of members after given the task. Whether it's an architectural firm, or a customer that needs a structure built, the process of designing the members requires calculations, plans of the structure and fabrication details for manufacturing.

Usually, after the design is determined, a draftsman details the structural members for fabrication. The details are given to the engineer for review and any corrections made with red pencil remarks. A good contractor will review the final plans, also. Mistakes can be made and a good review can take a long time, since it requires verifying measurements and structural shapes.

What are structural shapes? Most steel for fabrication is of standard sizes. The shapes include W-shapes, which are wide flange beams; S-shapes, which are commonly known as I-beams and a multitude of others, like angles, tees and square tubing. All have known characteristics, such as weight and how they behave under certain stresses.

No matter what the shape, all deals are off if the steel is heated to the point it starts becoming plastic. That's why many structures are fireproofed after erection. Whether it's an insulation, or gunnite, the coating helps prevent failures during a fire. Even then, exceptional events, such as the World Trade disaster happen, which exposed lightweight trusses to tremendous heat and caused them to fail. After the first failure, the static force of the above floors falling literally ripped the building apart as the combined loads struck the floors below.

Fabrication involves cutting, welding and hole drilling. Standard connection details are used and holes are drilled to accommodate the bolts. If the steel is to be galvanized, the members are tagged before the process of "pickling" - the acid bath before dipping - and then dipped in a vat of molten zinc. If painting is required, the steel is sand blasted before painting.

Steel arrives at the project site on flatbed trilers. What can be bundled is wrapped with wire, or placed on pallets. The larger items are just placed on the bed and bound with straps. This is where things can get interesting.

There's no guarantee the fabricator sent exactly what is needed. An error might have left some key members off, or the galvanizer may have lost some pieces. That's why the erection drawings, which usually come with the first load, are consulted. Every member has a number, and the location where it will be placed. Since assembly is an ordered process, someone is required to inventory the steel and verify it's what's needed. This "shaking out" can be as simple as going through the contents of a pallet, or as complicated as using a crane to move heavy members from a bundle and laying them out on dunnage. Losing a finger, or being crushed is always a possibility during this process. Steel is heavy, slides easily and a wrong move can end in disaster.

Before any of this happened, a foundation was placed. It may have been a simple concrete slab or an elaborate conglomeration of concrete foundations with multiple anchor bolts. This is where it all begins and the foundation must be correct.

Even with smaller structures, the first members are usually heavier than what a person can handle. This is where cranes, or forklifts are required. The columns are placed on the anchor bolts and the connecting girders are bolted. All bolts are just run up to snug, since steel can change dimensions due to heat and movement is required to assemble the steel.

As members are placed, ironworkers use spud wrenches to "stab" the bolt holes and temporarily hold the steel, until they can place a bolt. After that, the spud wrench is used to align the holes for more bolts. After all the bolts are placed, they move to another member.

Eventually, enough members are placed, the columns can be checked for plumb and the bolts can be "rattled up". Usually this means using an impact wrench, which can be a cumbersome tool, while working in an aerial lift, or standing on a beam, with only a harness to keep you from falling.

In the winter, steel is cold, can be slippery and if working up high, can lead to a miserable day in cold, unblocked wind.

In the summer, the steel can be too hot to touch with bare hands. Sitting on the steel can scorch the family jewels and being in close proximity adds heat to days that are already blistering hot.

Back in my younger days, I could hang with anyone all day and never look back. Now? I don't think I could do it for any length of time. Ironworking is a tough trade and best left for the young. When I did "hang iron", examining the finished project always left a sense of pride. Unless you've done it, it's hard to understand the satisfaction of seeing the hard work turn into something important.

When The Urge Strikes

For whatever reason, I had the urge for pancakes, so I went to a local grocery, bought a pound of house bacon, some frozen pancakes, spent a little time cooking, and feasted.

Now, it's time for a nap.

Steamy Post

You can put your dirty thoughts back into their box. This post is not about that.

I'm not content with just working in an industrial facility and not knowing the processes involved. That's why I've been paying attention to the boilers, equipment and steam use where I'm working.

They use a lot of steam, where I'm working. Rail cars, ships and barges come from great distances, are full of sulfur and the sulfur can be solid. That's where the steam comes into place.

The boilers fascinate me. Inside the combustion chambers are steel tubes, which is where the steam is produced. Natural gas, which is only one of many fuels, is used for the heat and the heat of the flames is increased by forced air blowers.

The basic process is the high temperature in the combustion chamber heats the water, the water flashes to steam and the steam is channeled through insulated piping. That's the simple process.

Steam has different temperatures at different pressures. The higher the pressure; the hotter the steam. At high pressures, the heat of the steam can reach the point it changes products into different substances, which is how petroleum is distilled and many products derived from crude oil. The downside is that the high temperatures are above the flash point of many of the products. At those temperatures, something seemingly insignificant, like a tiny leaking flange on a pipe, can result in an instant fire, since the only requirement left for combustion is the introduction of oxygen, which is abundant in air. That's why refineries limit employees during the process of bringing a unit back on line after maintenance. Things can get out of hand quickly, and disasters are not unknown.

Steam pressure is determined by regulators, so the heat is controlled and kept at the optimum temperature for the process. Where I'm working, the boilers are kept at about 110 pounds of pressure and the steam for the different processes varies. The steam travels through insulated pipes, into steam jackets on rail cars, which heats the sulfur above the melting point. The liquid sulfur is dumped into concrete trenches, that have steam loops in the bottom to insure the sulfur doesn't "freeze" during transfer. The sulfur flows into a pit and pumped to large storage tanks kept hot with steam.

Steam doesn't stay steam forever. As it's used, the temperature drops and the hot water is eventually collected back into the "hot well". From there, it's pumped to a deaeration tank, which supplies the boilers with water for steam. There, the process begins again.

Attrition through leaks requires makeup water for the system, which is controlled by a float in the hot well. When the well drops below a certain level, water is added.

Makeup water isn't just tap water. Chemicals are added to prevent scaling and corrosion in the boiler tubes, which can fail if the water is contaminated. If that should happen, the combustion chamber is "kicked" with super heated water, which raises the pressure tremendously. If the relief valves don't allow the gasses to escape, the boiler explodes. That's why boilers have sight port, so inspections can be made while the boiler is running. If the tubes appear to be distorted, or leaking, the boiler can be shut down for repair before a catastrophic failure.

In a perfect world, little to no water is added to the closed steam loop. But leaks happen and the amount of additional water is dictated by the amount of leaks. Since heating water requires expensive energy, steam leaks are frowned upon.

So, now you know as much about boilers as I do. They're fascinating, loud, hot critters that make noises that make your hair stand on end. While those that operate them are used to the noises, I'm not and they sometimes make me nervous.